|
Energizer Batteries in Ashboro Nc. has a new state of the art daylighting system from Orion. Cyclone Roofing a TectaAmerica, Co. installed 110 Orion Lightpipes on Energizers warehouse facility. Along with the light pipes was an interior lighting control system that complimented the natural light coming into the building. The interior lighting was on an IntelLite control system that would shut off one bulb at a time until the entire building was illuminated by natural light. The system will save Energizer almost 50% over their existing lighting cost.
|